01 September 2021

Share

Trails In The Kettle Moraine

Trails In The Kettle Moraine


Trails In The Kettle Moraine lowed on the connector trail). Hikers and off-road mountain bikers share this multiple-use trail system in season. For safety reasons, these trails are use-specific; hiking is not allowed on the bike trails and biking is not allowed on the hiking trails. An open-air reservable shelter is located near the trail head and drinking water and vault toilets are available

Share

Educational Calendar

Educational Calendar


Educational Calendar n Friday, September 3 — Sensational Seeds Nature Storytime at the Ice Age Visitor Center, 9:30 a.m.-10:30 a.m. From as tiny as a dust fleck to larger than a softball, seeds come in all shapes and sizes. Unearth how seeds help plants to grow and thrive. This hour of nature fun awaits three- to six-year olds with accompanying adults. n Saturday, September 4 — Saturday

Share

Share

25 August 2021

Share

Beach Expanded At Leonard J. Yahr County Park

Beach Expanded At Leonard J. Yahr County Park


Beach Expanded At Leonard J. Yahr County Park A ribbon-cutting ceremony was held on Friday, Aug. 20, for a newly expanded beach at Leonard J. Yahr County Park, which is located at 7999 Orchard Valley Road in the Town of Farmington. The event was a celebration of the new beach that has been expanded from roughly 2,100 square feet to about 10,200 square feet. Attending the event were Washington

Share

Share

Kubbapalooza Coming  This Weekend

Kubbapalooza Coming This Weekend


Kubbapalooza Coming This Weekend BY ANDREA HANSEN ABLER EDITOR You may have never heard of it, but a fun event is coming to the area this weekend — Kubbapalooza. It will pit teams against each other to see who is the best at the game Kubb. This is a lawn game that is gaining popularity around the area and the midwest. Kubb (pronounced koob) is a lawn game where the objective is to

Share

PHOTO SUBMITTED

PHOTO SUBMITTED


Road construction continues in downtown Campbellsport. Sewer and water mains are being replaced along Fond du Lac Avenue and on Main Street from Fond du Lac Avenue to Elm Street. In the phase two section, from Barton Street to Fond du Lac Avenue, the roadway is being paved. The phase one area, Main Street from the bridge to Elm Street, is being graded and curb and gutter being installed. The paving

Share

Share